6
Do not use solvents or aggressive detergent to clean the device. Use
a soft and clean cloth.
Do not modify the device or the connected power cord without
authorization.
Use appropriate safety-rope for safety.
Clean the machine regularly using water or smoke/haze cleaning fluid
(160.670)
6. Connect with power supply - The ground wire must be connected :
Use the plug to connect to the main power supply as following.
Wire Connection International signal
Brown Live L
Blue Neutral N
Yellow /Cyan Earth
7. Quick Trouble Shooting :
If the unit is not functioning properly
7.1 Check if main power is on and fuse hasn’t blown
7.2 The remote control is plugged in correctly in to the socket
7.3 Check there is fluid in the tank
7.4 Check that the pipe is pushed down to the bottom of the tank
7.5 Check the correct fluid has been used.
7.6 If there is a block use distilled water or haze machine cleaning fluid.
User Manual – Hazer HZ-2 160.450UK
8. Replacing Fuse :
Disconnect from the main power supply first, then remove the fuse holder
above the IEC Socket to reveal the fuse. Replace the correct fuse rating as
stated on lighting or user guide. Then, lock the fuse holder cover back into
place.
9. General Maintenance :
To maintain optimum performance and minimize wear, the item should be
cleaned frequently. Usage and environment are contributing factors in
determining frequency. As a general rule, fixtures should be cleaned after
use to avoid dust build-up and blockages. Which can result in poor
performances, overheating and breakages. Be sure to power off fixture
before conducting maintenance.
Unplug fixture from power. Use a vacuum or air compressor and a soft
brush to remove dust collected on external vents and internal components.
Clean the external case when the fixture is cold with a dry cloth or tissue,
and drag dirt and grime to the outside case.
To ensure a continuing high performance it is recommended to use water
or haze cleaning fluid (160.670) to clean the internal workings. Simply
empty the tank of any haze fluid. Fill with water or haze cleaning fluid then
operate two full cycles to clean the internal pipes this should be done once
every 2 months to ensure continuing high performance